Moon River Construction logo
Free Quote(720) 807-0379

Concrete, Landscaping & Remodeling in Parker, Colorado

Parker is about 33.4 miles south of our Brighton home base - a routine drive for us, and one we make regularly. Quote visits and scheduled work both fit our normal week here.

Get a Free Quote(720) 807-0379

Working in Parker

Parker is a city of roughly 58,512, and Parker sits in Douglas County. Parker sits in the south-east Denver metro, at about 5,870 feet.

Below is what Parker's own offices and water provider publish about permits, watering and backflow testing for the kind of work we do, checked October 13, 2026, with a link to each source.

Permits for concrete, driveways and walls in Parker

Who issues building permits in Parker?

Town of Parker Building Division (Community Development). The Building Division handles all building permits and inspections within incorporated Parker; applications go through the eTRAKiT portal, and contractors must call the office to set up an account and licensing (303-841-1970).

Source: parkerco.gov

What permit does driveway approach, curb or sidewalk work need in Parker?

Right-of-Way Use Permits from the Engineering/Public Works Department are required for all construction or alteration in the Town's public right-of-way and are applied for in eTRAKiT, where contractors must register. The checklist requires a project narrative, a certificate of insurance naming the Town, an MUTCD traffic control plan and a concrete or asphalt mix design as applicable, and restoration must be finished within five days of completing the work.

Source: parkerco.gov

When does a retaining wall need a permit in Parker?

A building permit is required for retaining or block walls over 48 inches tall.

Source: parkerco.gov

Water, sod and sprinkler rules in Parker

Watering rules change with drought stages and seasons. These are the rules the water provider published as of October 13, 2026; check the linked page before you seed, sod or change a sprinkler schedule.

Who supplies water in Parker?

Parker Water & Sanitation District (most of town); some subdivisions served by Cottonwood Water, Pinery Water and Wastewater, Stonegate, Compark or Meridian. PWSD serves most of the Town of Parker, but depending on the subdivision a home may be served by one of five other districts; PWSD's service-area map or customer care (303-841-4627) confirms an address.

Source: pwsd.org

What are the outdoor watering rules in Parker?

PWSD's summer restrictions prohibit watering from 10 a.m. to 6 p.m. and any water waste, and its watering-day guidelines assign Sun/Tue/Thu to even addresses and Mon/Wed/Sat to odd addresses and to multifamily, HOA and commercial properties. PWSD says the daytime restrictions ended for the year on Oct. 1; customers of the other districts follow their own district's rules.

Source: pwsd.org · cityoflonetree.com

Can new sod or seed get extra water in Parker?

During the restriction season PWSD customers need a sod/seed establishment permit (online form) to water new sod or seed outside the standard guidelines; PWSD says permits are no longer required after Oct. 1, when daytime restrictions end.

Source: pwsd.org

Does a sprinkler backflow preventer need testing in Parker?

PWSD's Cross-Connection Control Manual (Apr. 21, 2026 update) requires irrigation backflow preventers to be tested at seasonal startup and new assemblies within 10 days of installation, with results submitted within 10 days by an ABPA- or ASSE-certified tester through PWSD's backflow tester portal. Reduced-pressure assemblies are required on dedicated irrigation, commercial and 4-plus-unit multifamily services, and single-family homes are evaluated by degree of hazard.

Source: pwsd.org

Are there lawn replacement or sprinkler rebates in Parker?

  • PWSD Water Efficiency Rebates — For current PWSD customers (property owners): $50 for a WaterSense smart controller, up to $5 per rotary nozzle (max $100 per home), 50% of a rain sensor's cost up to $50, and up to $75 for converting a full sprinkler zone to drip; first-come, first-served until the year's funds run out. pwsd.org
  • Turf removal discount (Resource Central / South Metro Water Supply Authority) — PWSD customers can get a $750 turf removal discount through Resource Central's Lawn Replacement program, first-come, first-served until the year's funds are exhausted. pwsd.org
  • Garden In A Box discount — A limited number of $25 discounts on Resource Central Garden In A Box water-wise garden kits for PWSD customers each year. pwsd.org
  • Slow the Flow sprinkler consultation — Free sprinkler system consultations by Resource Central technicians for PWSD customers, ending with a custom watering schedule; first-come, first-served while funding lasts. pwsd.org

Also worth knowing in Parker

  • A Street Occupancy Permit is required to place landscape materials, storage containers, dumpsters or construction trailers in the Town right-of-way for more than 24 hours. parkerco.gov
  • Altering a fence, changing landscaping, removing trees, altering the tree lawn or installing xeric landscaping may need Town approval; the Town says to check with Community Development (303-841-2332). Fences over 6 feet need a building permit. parkerco.gov
  • Trees in the right-of-way are maintained by the HOA or metro district or, in some cases, the homeowner. parkerco.gov

What we take on in Parker

Concrete driveways, walkways, patios and repairs (concrete), new lawns and lawn repairs (sod installation), sprinkler repair and winterization (sprinkler repair), plus xeriscape and retaining walls, kitchen, bath and basement remodeling, flooring and interior painting. A job that spans more than one of those is still one crew and one point of contact.

Questions we get from Parker

Do you serve Parker?

Yes. Parker is about 33.4 miles south of our home base in Brighton, a routine drive we make regularly. Parker sits in Douglas County, and the permit question for your specific job gets answered before work starts, not after.

When is the right time of year for this in Parker?

At about 5,870 feet, the Front Range gives a reasonably long season for concrete and landscape work, though the shoulder months swing hard. Interior work - remodeling, flooring, painting - runs year round, and winter is usually the easiest time to get it scheduled.

Near Parker

We work throughout these neighbouring communities as well: Foxfield (6.4 mi), Castle Pines (6.7 mi), Lone Tree (7 mi). The full list is on our service area page.

In Parker? Let's take a look at it.

Free quote, no obligation. Tell us what you are trying to get done and we will tell you straight whether we are the right crew for it.

Request a Quote(720) 807-0379