Denver is about 20.3 miles south-west of our Brighton home base - a routine drive for us, and one we make regularly. Quote visits and scheduled work both fit our normal week here.
Denver is one of the largest cities on the Front Range, with about 715,522 residents, and Denver is its own consolidated city and county. Denver sits at the center of the metro, at about 5,280 feet.
Below is what Denver's own offices and water provider publish about permits, watering and backflow testing for the kind of work we do, checked October 13, 2026, with a link to each source.
City and County of Denver Community Planning and Development (CPD), Development Services. CPD reviews and issues building and zoning permits for single-family and duplex projects; simple projects such as most porches, patios, decks, sheds and fences can get same-day review at the walk-through counter (questions: 720-865-2710).
Source: denvergov.org
Any construction in Denver's public right-of-way, such as changing curb and gutter, sidewalks, driveways or curb ramps, requires review and approval by DOTI Transportation Engineering, and DOTI's Encroachments group (720-865-3003, DOTI.ER@denvergov.org) issues permits for construction work in the right-of-way. ROW construction, street-cut and street-occupancy permits are filed online through E-Permits, and a Street Occupancy Permit is always required in addition to the construction or street-cut permit.
Source: denvergov.org
Section 130.3 of the 2025 Denver Building Code exempts flatwork (hardscape) such as sidewalks, ramps and driveways from building permits when the walking surface is no more than 30 inches above grade, not over a basement or story below, and not part of an accessible route. Covered patios still need both a zoning and a building permit, and a new or modified driveway connection or curb cut is reviewed by city transportation engineers.
Source: denvergov.org
Denver requires a zoning permit for any wall over 12 inches high, including retaining walls, and the 2025 Denver Building Code exempts retaining walls from building permits only up to 4 feet total height (bottom of footing to top of wall, including any fence on top) and only if they do not support a surcharge. CPD's residential checklist requires structural calculations for retaining walls that retain more than 24 inches of soil or are over 4 feet from the bottom of the footing, and masonry or retaining walls over 6 feet get engineering plan review.
Source: denvergov.org
Watering rules change with drought stages and seasons. These are the rules the water provider published as of October 13, 2026; check the linked page before you seed, sod or change a sprinkler schedule.
Denver Water. Denver Water serves the city of Denver and many surrounding suburbs.
Source: denverwater.org
Under Denver Water's Stage 1 drought (declared March 25, 2026), lawns could be watered only two assigned days a week (single-family even addresses Sunday/Thursday, odd addresses Wednesday/Saturday, all other customers Tuesday/Friday) and only between 6 p.m. and 10 a.m. Since Oct. 1, 2026, all lawn watering and spray irrigation is prohibited until further Board action, while trees, shrubs, perennials and vegetables may be watered any day by hand-held hose with a shut-off nozzle or by drip.
Source: denverwater.org
During the 2026 drought, Denver Water's Watering Establishment Permit allowed watering of new bluegrass seed, sod, trees or plants for up to 3 weeks and new native grass seed for up to 8 weeks, with watering rules and drought pricing still applying. As of Oct. 1, 2026, Denver Water no longer issues these permits except for Lead Replacement Program, mainline pipe replacement and Certificate of Occupancy projects.
Source: denverwater.org
Denver Water requires backflow prevention assemblies to be tested by a certified tester at installation and every year after, with test reports sent to crossconnectioncontrol@denverwater.org. Irrigation systems must use a reduced-pressure assembly or pressure vacuum breaker, and irrigation assemblies are tested May through September when the water is turned on.
Source: denverwater.org
Concrete driveways, walkways, patios and repairs (concrete), new lawns and lawn repairs (sod installation), sprinkler repair and winterization (sprinkler repair), plus xeriscape and retaining walls, kitchen, bath and basement remodeling, flooring and interior painting. A job that spans more than one of those is still one crew and one point of contact.
Yes. Denver is about 20.3 miles south-west of our home base in Brighton, a routine drive we make regularly. Denver is its own consolidated city and county, and the permit question for your specific job gets answered before work starts, not after.
At about 5,280 feet, the Front Range gives a reasonably long season for concrete and landscape work, though the shoulder months swing hard. Interior work - remodeling, flooring, painting - runs year round, and winter is usually the easiest time to get it scheduled.
We work throughout these neighbouring communities as well: Glendale (3.8 mi), Edgewater (3.9 mi), Mountain View (4.3 mi). The full list is on our service area page.
Free quote, no obligation. Tell us what you are trying to get done and we will tell you straight whether we are the right crew for it.